PROJECTS 

 

February 2018 

80 Cannon Street London- EC4N 6HL 
Replace Reception Counter desk top. 
 
28 Windmill Street London-W1T 2JJ 
Carried out Flat roof survey. 
 
The Blair Partnership Pottermore OfficesLondon-W1T 4JE 
Install Data points in 5th Floor offices. 
 
Department of Transport London-SW1P 4DR 
Works to roof Air Handling Units. 
 
 
 
Totfield House London-W1T 4HD 
Refurbishment Male WC 1st Floor. 
 
Hospital Hospital Main Theatres Dirty Corridor-E9 6SR 
Refurbishment Corridor Phase 1 & 2. 
 
Middlesex House London First-W1T 4JE 
Replace all Cubicle Indicator Bolts.  
 
Fountayne Road Clinic- NW6 7EA 
Repair to wall & ceiling due to Roof leaking. 
 
John Howard Centre High Security Mental Health-E9 5TD 
Repair damaged Wardrobe bedroom 16 
 

March 2018 

 
Clifden Road Hospital Hospital- E9 6SR 
Window Repairs & Windows Replacement. 
 
Tuke Ward Homerton Hospital- E9 6SR  
Replace Store room Door. 
 
The Buckley Building London-EC1R 0EB 
Install 600 x 600 Hatches. 
 
Homerton Hospital Urology-E9 6SR 
Replace Kitchen units, Worktop & sink. 
 
John Howard Centre High Security Mental Health unit-E9 5TD 
Repair Staff Shower Front Entrance. 
 
Surgical Centre Homerton Hospital-E9 6SR 
Install wall Protection. 
 
 
 
 
 
Molecular Laboratory, Homerton Hospital, E9 6SR 
Carry out alterations to existing rooms for new testing equipment to be installed, to include alterations of existing compact solid grade laminate benching, manufacture of bespoke shelving units for testing equipment and electrical alterations. 
 
Fire Exit Door, Main Outpatients, Homerton Hospital, E9 6SR 
Carry out repairs and alterations to metal framed fire exit doors. 
 
Leyton Green Retinal Screening, E10 6AE 
New WC system to allow ease of maintenance, with whiterock cladding and compact laminate easy access lid. 
 
Burdett House, Mile End Hospital 
Supply and fit 3 No. worktops with 2x1 battening and chrome legs. 
 
Joshua Ward, Homerton Hospital, E9 6SR 
Manufacture and fit new hardwood beech door frame to a lacquered finish, to include stops to match existing as near as possible. Re-fit existing door. 

January 2018 

Redbridge Retinal Screening Clinic Ilford- IG1 4TD 
Service 2No Combination Boilers. 
 
Allford Hall Monaghan Morris Architects Old Street- EC1V 9HL 
Refubishment work. 
 
Department of Transport London-SW1P 4DR 
Repair to Core 4 Security Office Heavy Duty Side Entrance Door. 
 
Homerton Hospital Pharmacy- E9 6SR 
Replace Brick work, replace window Frame & make good walls in Offices. 
 
Fountayne Road Clinic- NW6 7EA 
Install Hand Dryer in Male & Female Toilets. 
 
Redbridge Retinal Screening Clinic Ilford-IG1 4TD 
Repairs to 3No Boilers. 
 
Cavell House Norwich- NR3 1YE 
Install cold water supply to 1st Floor Coffee Machine 

December 2017 

Ministry of Justice 10th Floor-SW1H 9AJ 
Replace Disabled Toilet. 
 
Homerton Hospital Mental Health-E9 6SR 
1st Floor Office refubishment. 
 
Homerton Hospital Pathology-E9 6SR 
Waste Alteration for new Machinary already install. 
 
The Buckley Building, Clerkenwell-EC1R 0EB 
Re-decoration of offices.